Project Details
R
eport
pt
P
rint
rn
D
ownload
/L
Save
Share
Share
Facebook
Twitter
Google
Electricity Transmission
Project Details
Documents
Ideas for future projects?
Apr 2013
Electricity Transmission
Harmonic Data Gathering Project Organised by ENA
Reference:
Status:
Live
Start Date:
Apr 2013
End Date:
Unknown
Funding Licencee(s):
National Grid Electricity System Operator
Contact:
National Grid TO Innovation Team
Click here to send a question to the contact.
Funding Mechanism
Innovation Funding Incentive
Research Area:
None
Core Technology(ies):
Asset Management
Estimated Expenditure:
£21,000.00
Introduction:
Organised by the Energy Network Association (ENA), National Grid is in collaboration with DNO companies to conduct a system wide survey on the existing harmonic distortion on the electricity supply system in the UK The survey has been conducted since February 2005.
Objectives:
The key objectives of this survey are as follows:
To determine the harmonic voltage levels during the defined 5 years
To obtain the trend of harmonic distortion for the period of survey
To investigate any correlation in harmonic voltages on transmission and distribution systems at the measured sites
Verify whether or not the existing control measures are sufficient to meet the needs of a society with an ever appetites for equipment that generates harmonic current.
Related Links
National Grid Innovation Page on Jul 16, 2013
http://www.nationalgrid.com/corporate/About+us/innovation
National Grid Innovation Funding Incentive and Annual Report(s) on Apr 08, 2013
http://www.nationalgrid.com/uk/Electricity/Info/IFI/