Close
Forgotten Password?
Login?
Register Me
Home
About
Contact
More
More
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Login
Home
About
Contact
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Project Details
R
eport
pt
P
rint
rn
D
ownload
/L
Save
Share
Share
Facebook
Twitter
Google
Electricity Distribution
Project Details
Documents
Ideas for future projects?
Feb 2013
Electricity Distribution
Dynamic Line Rating
Reference:
Status:
Live
Start Date:
Feb 2013
End Date:
Unknown
Funding Licencee(s):
Electricity North West Limited
Contact:
Electricity North West Innovation Team
Click here to send a question to the contact.
Funding Mechanism
Innovation Funding Incentive
Research Area:
None
Core Technology(ies):
High Voltage Technology
Estimated Expenditure:
£0.00
Introduction:
This project is installing a distributed weather and conductor temperature monitoring system on a 132kV and 33kV overhead line in Cumbria and developing a Dynamic Line Rating (DLR) calculation engine within our control room management system based on the Cigré algorithm.
Objectives:
The increasing pressure to connect distributed energy systems without (or with minimal) constraints and in a sustainable way is leading to a great deal of interest in the subject of DLR. Electricity North West are aiming to explore the physical loading limits of our assets rather than limit the potential connection of distributed energy sources to national planning standards.
Related Links
Electricity North West Limited Innovation Site on Apr 29, 2014
http://www.enwl.co.uk/about-us/the-future
Electricity North West Limited Innovation Site on Apr 29, 2014
http://www.enwl.co.uk/about-us/the-future