Jun 2018
Electricity Distribution
Real Time Thermal Ratings – Cables
NIA_UKPN0038
Live
Jun 2018
Dec 2020
UK Power Networks and London Power Networks
Hytham Emam
Click here to send a question to the contact.
Network Innovation Allowance
ED - Network improvements and system operability
£284,625.00
The project aims to develop the following:

·   Verified thermal model for underground cables against actual measured temperatures.

·   Verified thermal model for tunnel cables against actual measured temperatures.

·   Software platform for what-if analysis and asset management scenarios for planning.

·    Real time ratings provided to Control Engineers.
Development of standardised DTS equipment specifications for monitoring our cables (increasing suppliers base).