Aug 2013
Gas Distribution
Large CISBOT (Cast Iron Joint Sealing Robot)
NIA_SGN0019
Complete
Aug 2013
Aug 2014
SGN
Ryan Smith, Innovation Delivery Manager
Click here to send a question to the contact.
Network Innovation Allowance
GD - Repair
Gas Distribution Networks
£834,600.00
The scope of this project is to carry out a detailed technical assessment and field trial of the joint sealing robot ‘Large CISBOT’, which has the potential to repair or rehabilitate a number of cast iron joints under live conditions in a more cost effective manner than existing methods. The project will consider the potential for repair of 18” to 48” diameter cast iron mains.

The objective of this project is to develop an innovative solution for the repair of leaking lead yarn joints within SGN’s cast iron mains population. The project will evaluate the effectiveness of the repair technique and associated inspection method to determine extension to asset life and to understand the potential cost benefit.

The project will be deemed to be successful if the following outcomes are achieved:

  • Practical assessment of the Large CISBOT’s performance when repairing large diameters mains using the trenchless technique

  • Commercial appraisal of the most suitable operating model

  • Assessment of whether repair to Tier 3 Cast Iron Joints under live gas conditions using CISBOT is possible

  • The production of a technical, risk and commercial assessment of the operation of CISBOT

  • Understanding of the opportunity to reduce excavation requirements in relation to joint repair

  • Understanding of the potential reduction in the amount of material sent to landfill

  • Understand the potential to prolong the life of the ageing cast iron mains.