Project Details
R
eport
pt
P
rint
rn
D
ownload
/L
Save
Share
Share
Facebook
Twitter
Google
Electricity Transmission
Project Details
Documents
Ideas for future projects?
Nov 2018
Electricity Transmission
Substation Time Synchronisation to Safeguard the Network
Reference:
NIA_NGTO025
Status:
Complete
Start Date:
Nov 2018
End Date:
Nov 2019
Funding Licencee(s):
National Grid Electricity Transmission
Contact:
Linwei Chen
Click here to send a question to the contact.
Funding Mechanism
Network Innovation Allowance
Research Area:
ET - Network improvements and system operability
Core Technology(ies):
Resilience
Estimated Expenditure:
£91,110.00
Introduction:
Substation protection and control systems require each device to be synchronised to UTC (Co-ordinated Universal Time), which is currently achieved using Global Positioning System (GPS). Recent studies on GPS use and dependency have highlighted the vulnerabilities of GPS signals, and a robust solution for time synchronisation based on more diverse sources of time should be developed. This project investigates alternative timing solutions that could deliver independent time references into substations, minimising the risk of a single source failure.
Objectives:
The project aims to investigate the benefits, costs and challenges of using alternative technologies (i.e. multi-GNSS, IEEE 1588 based time dissemination over optical fibre, and holdover clocks) to reduce security risks and enhance resilience of the existing GPS-based solution for substation time synchronisation.