Aug 2018
Gas Transmission
Destructive Testing of Set-In and Set-on Nozzle connection welds
NIA_NGGT0136
Complete
Aug 2018
Dec 2018
National Grid Gas Transmission
Alan Kirkham
Click here to send a question to the contact.
Network Innovation Allowance
GT - Reliability and maintenance
Gas Transmission Networks
£123,516.00
The objective of the project will be to determine that with the selection of a suitable non-destructive ultrasonic system and using suitably controlled techniques, it is possible to detect defects within the set-in and set-on nozzle connections which could be detrimental to the integrity of that weld.
The objective of the project will be to determine the selection of a suitable non-destructive testing technique that makes it possible to detect defects within the set-in and set-on nozzle connections, which could be detrimental to the integrity of the welds.
To detect defects within the set-in and set-on nozzle connections which could be detrimental to the integrity of that weld.