Close
Forgotten Password?
Login?
Register Me
Home
About
Contact
More
More
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Login
Home
About
Contact
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Project Details
R
eport
pt
P
rint
rn
D
ownload
/L
Save
Share
Share
Facebook
Twitter
Google
Gas Distribution
Project Details
Documents
Ideas for future projects?
Jan 2017
Gas Distribution
MEG Fogger Phase 5
Reference:
NIA_NGGD0088
Status:
Complete
Start Date:
Jan 2017
End Date:
Mar 2020
Funding Licencee(s):
National Grid Gas Distribution
Contact:
Quentin Bahlmann
Click here to send a question to the contact.
Funding Mechanism
Network Innovation Allowance
Research Area:
GD - Reliability and maintenance and GD - Environment and low carbon
Core Technology(ies):
Gas Distribution Networks
Estimated Expenditure:
£1,065,588.00
Introduction:
The scope of work for the project includes:
Redesign and repackaging of the existing design.
Lifetime testing of the spray modules.
Manufacture of the prototype modules for the field trials and CE mark certification.
Installation and commissioning of the units in four trial sites, and monitoring for 12 months.
Removal of the units on completion of the trial
Objectives:
The objectives of the project
Design and manufacture a prototype spray head that can be retro fitted to current MEG fogger units.
Successful lifetime testing and CE mark certification prior to installation
A demonstrated increase in MEG saturation levels as result of the operation of the new fogger head technology.
Expected Benefits:
Demonstrated and documented increase in saturation levels as a result of the installation of the ne fogger head units.
A reliable prototype unit capable of being produced to be installed on the network.