Close
Forgotten Password?
Login?
Register Me
Home
About
Contact
More
More
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Login
Home
About
Contact
Network Operators
Funding Timeline
LCNI Presentations
Annual Innovation Summary
Funding Documents
Document Templates
Events
Project Details
R
eport
pt
P
rint
rn
D
ownload
/L
Save
Share
Share
Facebook
Twitter
Google
Electricity Distribution
Project Details
Documents
Ideas for future projects?
Apr 2013
Electricity Distribution
Outram Fault Level Monitor
Reference:
IFI 1007
Status:
Live
Start Date:
Apr 2013
End Date:
Unknown
Funding Licencee(s):
SP Energy Networks
Contact:
SP Energy Networks Innovation
Click here to send a question to the contact.
Funding Mechanism
Innovation Funding Incentive
Research Area:
None
Core Technology(ies):
High Voltage Technology
Estimated Expenditure:
£121,196.00
Introduction:
It is proposed that the instrument could provide a viable alternative for fault level assessment to extensive modelling or at locations where upstream and downstream fault level can vary drastically over a period of time making traditional fault level analysis complex.
Objectives:
The aim of this project is to development of a portable instrument that can successfully measure fault level on a distribution network with repeatability and reliability. The developed instruments will be deployed in at various locations where there is uncertainty in fault level in Low Voltage, 11kV, 33kV and 132kV groups on the network.
Related Links
SPEN Innovation Funding Incentive and Annual Report(s) on Apr 03, 2013
http://www.spenergynetworks.com/innovation/innovation_funding_incentive.asp?NavID=2